The AES Zeeland array, which is AES’s first installation on the European continent, will provide Primary Control Reserve (PCR), matching supply and demand for an integrated market. Using Advancion® 4, AES Zeeland is supporting the European transmission grid via regional distribution system operator DELTA Netwerkgroep and transmission system operator, TenneT.

Vermogen
10 MW
Capaciteit
10 MWh
Datum Start of operation
31-12-2015
Status van het project
Operationeel
ESNL deelnemer betrokken?
Ja
Afnemer
TenneT
Contractor
DELTA Infra
Leverancier
Samsung SDI, Parker Hannifin