ENERGYNEST supplies power-to-heat systems with heat storage and thermal storage for the reuse of waste heat to industrial users. The heat storage is filled at Mebin in Europoort [...]
At MAT Afbouw, Indutecc supplied a Sofar Powermagic of 125kW/215kWh to support the limited 80A grid connection for power requirements greater than 55kW. [...]
Solution for Grid Challenge at Kwintes in Scherpenzeel Kwintes in Scherpenzeel faced a challenge with the grid connection, which prevented the desired energy supply from being realized. [...]
The Nutri Dynamics project faced a grid connection challenge, requiring a solution to accommodate contracted power [...].
Due to capacity growth in a data center in the Alkmaar region, where capacity expansion was not possible due to a limitation of the contracted transmission capacity, we conducted a Peak [...]