Zero-emission inland waterway transport using swappable energy containers

For ๐—ญ๐—ฒ๐—ฟ๐—ผ ๐—˜๐—บ๐—ถ๐˜€๐˜€๐—ถ๐—ผ๐—ป ๐—ฆ๐—ฒ๐—ฟ๐˜ƒ๐—ถ๐—ฐ๐—ฒ๐˜€, a fully integrated public charging station and smart energy hub has been delivered to CCT Moerdijk. The installation makes it possible to fully charge so-called ZESpacks (interchangeable 20-foot battery containers for inland waterway vessels) with green electricity in just three hours.

๐—ž๐—ฒ๐—ป๐—บ๐—ฒ๐—ฟ๐—ธ๐—ฒ๐—ป ๐˜ƒ๐—ฎ๐—ป ๐—ฑ๐—ฒ ๐—ผ๐—ฝ๐—น๐—ผ๐˜€๐˜€๐—ถ๐—ป๐—ด:

  • ๐—š๐—ฒ๐—ฑ๐—ฒ๐—ฒ๐—น๐—ฑ๐—ฒ ๐—ป๐—ฒ๐˜๐—ฎ๐—ฎ๐—ป๐˜€๐—น๐˜‚๐—ถ๐˜๐—ถ๐—ป๐—ด ๐˜๐—ฒ๐—ด๐—ฒ๐—ป ๐—ป๐—ฒ๐˜๐—ฐ๐—ผ๐—ป๐—ด๐—ฒ๐˜€๐˜๐—ถ๐—ฒ: The facility shares the electrical grid connection with the Combined Cargo Terminals (CCT) terminal. This prevents overloading of the power grid.
  • ๐— ๐˜‚๐—น๐˜๐—ถ๐—ณ๐˜‚๐—ป๐—ฐ๐˜๐—ถ๐—ผ๐—ป๐—ฒ๐—น๐—ฒ ๐—ฒ๐—ป๐—ฒ๐—ฟ๐—ด๐—ถ๐—ฒ๐—ต๐˜‚๐—ฏ: When there are no ships (such as the Den Bosch Max BV) docked at the pier, the charged battery containers can be flexibly deployed for mobile shore power, temporary construction power, or local grid support.
  • ๐—š๐—ฒ๐—ฎ๐˜ƒ๐—ฎ๐—ป๐—ฐ๐—ฒ๐—ฒ๐—ฟ๐—ฑ๐—ฒ ๐˜€๐˜๐—ฒ๐—ธ๐—ธ๐—ฒ๐—ฟ๐˜ƒ๐—ฒ๐—ฟ๐—ฏ๐—ถ๐—ป๐—ฑ๐—ถ๐—ป๐—ด: The system uses the latest generation of MCS (Megawatt Charging System) connectors. This enables a fast, safe, and automated connection to the ship.
  • ๐—œ๐—ป๐˜๐—ฒ๐—ด๐—ฟ๐—ฎ๐—ฎ๐—น ๐—ฒ๐—ป ๐—บ๐—ผ๐—ฑ๐˜‚๐—น๐—ฎ๐—ถ๐—ฟ ๐—ผ๐—ป๐˜๐˜„๐—ฒ๐—ฟ๐—ฝ: The system is โ€˜plug-and-play,โ€™ with Electroproject supplying the smart energy and control technology. SPIE designed the infrastructure, from the grid connection to a robust installation.
  • ๐—•๐—ฎ๐˜๐˜๐—ฒ๐—ฟ๐—ถ๐—ท ๐˜€๐˜†๐˜€๐˜๐—ฒ๐—ฒ๐—บ: Although the installation currently runs on lithium-ion batteries, the system is designed to be compatible with other energy sources in the future, such as hydrogen containers.

Photos of this project

Pagina delen

Owner of the project
Electroproject B.V.


Street and house number
35 Middenweg


Province
North Brabant


Power in kW
2 MW


Capacity in kWh
5 MWh